Time flies.  This is mid-January of the exciting year 2011.  On a very very very cold day (-30 degree with wind chill), I paid a visit to my future home today.  I was there for over an hour inspecting this and that...  Even though I was inside the house, it is very cold without the heat.  My hands were shaking while I was taking photos.

Looking from the outside, the dark grey siding is being installed.  The front has the dark grey wood board with black architectural accent around the windows.   The garage is prepared for stone installation.  Do you see the little guy on the right?  Poor guy working outside at this low temperature!   I found myself fortunate as I just work at the office...



The electrical rough-in has been completed, e.g., electrical wiring, switch boxes, lighting fixture place holders, smoke detector place holders, phone wiring and cable wiring. 



Hood fan piping for the kitchen and bathrooms has been completed.



Central vacuum rough in has been installed.



Furnace and fireplace have been installed.



Power panel in the basement has been installed.



Basement plumbing layout is completed.