Wednesday, December 29, 2010

2010-12-12 Plumbing

Here are some photos taken in early December 2010 after framing and plumbing rough-in were done.  The great room has an open to below concept with four huge windows to be installed soon:



The preparation for the fireplace is made across from these big windows in the great room:


Another front side shot of my future home:



My beloved washer and dryer will be located in the mud room and here is their rough-in plumbing:


The common area has a big Kitchen Island and it will be on top of these plumbing rough-in:


The full bath on the main floor will be pretty roomy with a full size shower:


The rough-in is also done for the sink and toilet:


The main bath room rough-in on the 2nd floor:


The master ensuite rough-in:


The master bedroom ensuite double sink rough-in: