Here are some photos taken in early December 2010 after framing and plumbing rough-in were done. The great room has an open to below concept with four huge windows to be installed soon:
The preparation for the fireplace is made across from these big windows in the great room:
Another front side shot of my future home:
My beloved washer and dryer will be located in the mud room and here is their rough-in plumbing:
The common area has a big Kitchen Island and it will be on top of these plumbing rough-in:
The full bath on the main floor will be pretty roomy with a full size shower:
The rough-in is also done for the sink and toilet:
The main bath room rough-in on the 2nd floor:
The master ensuite rough-in:
The master bedroom ensuite double sink rough-in: